Electrical Bonding...
The electrician made it out and completed the ground bonding of the fixtures and the rebar. He left some ground wire loops outside the pool for attaching to the deck rebar. The conduit from the niches were installed, too. Hopefully, the inspector will pass the work tomorrow.
I'm trying to line up the shotcrete for late next week. That'll give me time to finish the plumbing.