Saturday, May 06, 2006
We have Water!
The water truck showed up at 5PM and had to wait until about 5:30PM before he started filling...
It only took three loads of water to fill the pool and spa!
Now, I have to brush the plaster, every square inch, 2-4 times/day for the first week and 1-2 times/day the second week.
The spa outside wall still needs to get stone and the equipment wall still needs siding.